• Bottled Juice Filling Production Line
  • Bottled Juice Filling Production Line
  • Bottled Juice Filling Production Line
  • Bottled Juice Filling Production Line
  • Bottled Juice Filling Production Line
  • Bottled Juice Filling Production Line

Bottled Juice Filling Production Line

After-sales Service: Online/Spare
Warranty: 12months
Certification: CE
Power Source: Electric
Process: Thermal Processing
Automatic Grade: Automatic
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CGFH-Series
Application
Mango Juice
Customized
Customized
Filling Valve
Hot Filling
Packing
Film
Main Material
SUS
Pump
Cnp
Transport Package
Wooden Block
Specification
5000bph
Trademark
GM
Origin
China
HS Code
8422301090
Production Capacity
10sets/Year

Product Description

Bottled Juice Filling Production Line

Description of the juice filling production line
Usage: CGF series washing, filling and capping 3-in-1 unit is used for filling kinds of carbonated drink into bottles. In one machine, it can finish washing, filling and capping three processes.
Primary features:
1) Compact conformation, good shape, cozy operation, excellent automaticity and poor labor intensity.
2) Only exchanging "star wheel", "feeding screw" and "arc guide plate" is needed while  exchanging model of bottle.
3) The all parts directly contacted with material are all adopted with food stage stainless steel without dead angle, so they can be cleaned easily.
4) Adopting advanced valve to control the inlet flow rate of liquid. It can keep the slight turbulence of liquid level in the solution barrel and ensure the accuracy in filling.
5) Closing feeding valve automatically while no bottle on machine avoid the loss of aqueous feet. Filling automatically is with a high speed and the control of liquid level is accurate.
6) The magnetic-constant-torque device is adopted in capping head to ensure the high capping quality without damage.
7) Adopting efficient cap settling system which carried perfect cap feeding and protection device.
8) It is adopted spiral descent fashion for the support plate for bottom of bottle at the outlet thumb wheel. And to adjust the input height is not necessary for exchanging model of bottle.
9) carried the perfect protection system to overload; it can be used to protect facilities and operators efficiently.
10) Because of applying touch screen for operation, it is possible to realize man-machine conversation whereas the status of device running is clear at a glance.
11) The primary electric components such as touch screen\PLC\transducer etc. are all adopted with well known import products.

complete mango juice production line 
This line is for the mango juice production from the fruit .
beverage pre treatment system 
filling using hot filling valve , 
film packing with 4*6 or 3*4
ink jet printer 
the main machine list as following 
No Name Model Power (kw) Qty
1 Fruit washing machine CXJ-2 5.15 1
2 Elevator BSJ-2 0.75 1
3 Juice extractor LZ-1 11 1
4 Buffer tank 2T   1
5 Centrifuge LJ-1 3 1
6 mill JM 11 1
7 Pump CHL2-40 0.37 2
8 Prepare tank 1T 0.55 1
9 invert sugar tank 0.6T 10 1
10 Duplex filters 3T   1
11 Vacuum de-air TQ-2.5 2.2 1
12 Homogenizer GJJ 7.5 1
13 Asepsis Tank 2T   1
14 Instantaneous sterilizer RSCG01-2 20 1
15 High tank 0.3T   1
16 Washing,filling,capping3-in-1 CGF16-16-5 4 1
17 Down bottle sterilizer DP-6 1.4 1
18 Spray cooling machine LP-6 3 1
19 Dryer CG 1.5 1
20 Sleeve label machine SD-100 20 1
21 Wrapping machine WD-150 18 1
Packing and loading
We packed the machine by wooden case ,and mainly shipping to your countries .


Glory factory:


FAQ:
Delivery time : 35-45working days after recieved the bottle and cap samples
install machine need 7-15working days
we offer the drawing free according to the users workshop
Packing:wooden case ,film, wooden block
warranty :12months after the machine out factory.
layout design:free
voltage ,can be according to the client request.
Install service :we have the engineers for helping the machine assembling in user's workshop .
Need user's offer engineer tickets and 80-100USD/Day/Person
Preparation work for users: electrical source ,water source, air source and machines in the place  should be ready when the engineer start the travel .
Glory machine in the world :
Russia, India ,Vietnam , Panama , ,Mongolia, Tajikistan ,Colombia ,Paraguay ,Guatemala  etc
Contact us: Thank you for interesting our products. please contact with us by the following ways .
Bottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production LineBottled Juice Filling Production Line
Bottled Juice Filling Production Line
 GM-0037

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now