5Gallon PC material speical extrusion blow molding machine
Suitable for PC speical blowing machine ,for 20L bottles ,
BASIC INSTALLATION INCLUDING
Die head: special designed die headExtrusion system: Adopt import automatic temperature controlling device. Drive the screw with motor reducer to realize stepless regulating.Clamping device: Adopt bi-directional synchronous clamping device with double axis single cylinder.Blowing device: Blowing device with upper blowing typeHydraulic system: The whole hydraulic system adopts import controlling components with famous broad and proportional controlling circle.Electric controlling system: Adopt PLC made by Panasonic. Every electric component is in famous brand.
Main parameters
Extruder |
1 |
Screw diameter |
82mm |
2 |
L/D ratio |
25:1 |
3 |
Screw speed |
40-80r.p.m. |
4 |
Drive motor |
Frequency 30kw 6level/Siemens |
5 |
frequency control |
LITEON |
6 |
Heating section with air cooling |
4 |
7 |
output |
150kg/h(PC granules) |
8 |
Heating power |
4X7.2 (=28.8) kw |
9 |
Vertical adjust range |
450mm |
10 |
Forward and backward adjust range |
550mm |
11 |
Feeding section force cooling set |
NO |
12 |
Reducer case |
Guomao(200) |
13 |
Security platform, ladders and safety rail |
yes |
Note :material:HDPE Such as:6888 model |
Die head |
1 |
Accumulator capacity |
4L(3kgHDPE) |
2 |
structure |
First in first out |
3 |
number of heating zone |
4section |
4 |
Heating power |
10.5kw |
5 |
Max diameter |
150mm |
6 |
Injection force |
200mm |
7 |
Injection force test |
electronic ruler( Italy) |
8 |
Injection pressure |
10Mpa |
9 |
Ext ruder stop |
You can control stop bin level or bin full |
|
CLAMPING UNIT |
1 |
pull |
Diagonal double pull |
2 |
Mould size |
760(W)X660(H) |
3 |
Min Mould thickness |
410mm |
4 |
Clamping force |
220KN |
5 |
Opening and closing |
400-900mm |
6 |
Max die size |
600×700mm |
7 |
Opening and closing test |
Close to switch |
8 |
valve |
North-man,YUKEN |
9 |
Cylinders number |
2 |
10 |
High pressure |
14mpa |
11 |
Mould moving support part |
guide |
Hydraumatic system |
1 |
Oil pump motor |
15Kwservo motor |
2 |
hydraumatic valve |
Taiwan North-man |
3 |
hydraumatic pump |
SUMITOMO servo(50pump) |
4 |
Joint,tubing |
TAIWAN |
5 |
sealing |
TAIWAN |
6 |
Tank volume |
180L |
7 |
Working pressure |
12mpa |
8 |
Oil cooling water |
yes |
9 |
Oil temperature and oil level control |
Oil temperature test and alarm, oil level by level gauge |
|
Pneumatic system |
1 |
Working pressure |
0.7mpa |
2 |
Blowing pressure |
0.6mpa |
3 |
Blowing needle blow |
High and low pressure control |
4 |
Blowing at intervals |
yes |
5 |
Die blowing |
yes |
6 |
Electromagnetic valve of pneumatic system |
Taiwan(AIRTEC) |
7 |
exhausting with high speed |
yes |
|
.Modeling control |
1 |
controller |
GEFRAN300spot |
2 |
Servo valve |
ATOS(Italy) |
3 |
servo-cylinder |
With die head |
4 |
hydraulic part |
variable displacement piston pump, YUKEN |
|
Electric |
1 |
Cont actor |
famous brand |
2 |
Total capacity(about) |
78kw |
3 |
Average energy consumption(about) |
35kw |
|
Cooling water |
1 |
Cooling water for machine |
5000L/hr |
2 |
Cooling water for mold |
2500L/hr |
|
Air consumption |
1 |
Compress air consumption |
1.2m3/min |
PLC control |
Italy GEFRAN |
2 |
Operation floor |
Italy GEFRAN |
3 |
Recipe storage |
yes |
|
Heating control |
1 |
Heating main element |
Intermediate relay+cont actor |
2 |
control |
PLC control |
3 |
thermocouple type |
K type |
4 |
Upper and lower alarm |
yes |
5 |
Screw cold Start protection control |
yes |
6 |
thermocouple and heating wire break alarm |
Have thermocouple wire break alarm,heating wire break alarm (you can choose) |
7 |
Preheating function |
yes |
|
Mould core and and mould set |
1 |
Mould core and mould set |
Customer supply die size |
2 |
Material for test machine |
Customer supply |
|
1 |
Blow down(hydraumatic)and packing(air-operated) |
Lift down blow |
2 |
manipulator |
yes |
3 |
Outside size(M) |
4.8×2.5×3.9(L×W×H) |
|
Machine weight(T) |
11.8 |
DELIVERY TIME
75 working days after the down payment;
TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week in the Buyer's factory.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's visa application cost, round air tickets, food & board before his departure;
GUARANTEE
The guarantee time is one year after the machines arriving in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.
GM-0205