Gold Member Since 2016
Audited Supplier
Zhangjiagang Glory Machinery Co., Ltd.

5gallon Keg Filling Machine, Keg Filling Machine, Keg Water Filling Machine manufacturer / supplier in China, offering Automatic 5gallon Keg Water Filling Machine, Automatic High-Speed Heat Shrinkable Packaging Machinery for Garbage Bag, Automated Shrink Packaging Equipment for Water Bottle and so on.

(/ )

Automatic 5gallon Keg Water Filling Machine

FOB Price: US $100,000-150,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $100,000-150,000/ Piece
Get Latest Price
Port: Shanghai, China
Production Capacity: 10sets/Year
Payment Terms: L/C, T/T, Western Union, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: QGF-SERIES
  • Automatic Grade: Fully Automatic
  • Filling Valve Head: Multi-Head
  • Dosing Device: Surface Type
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Barrel
  • Capacity: 1200bph
  • Main Material: Ss
  • Pump: Cnp
  • Pipe: Ss
  • Liquid: Water
  • Trademark: GM
  • Specification: 1200
  • HS Code: 8422301090
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Multi-Room Feeding
  • Filling Principle: Atmospheric Pressure
  • Structure: Rotary
  • Packaging Material: Plastic
  • Bottle Size: 3-5gallon
  • Filling Valve: Normal Pressure Filling
  • PLC: Japan
  • Eletrical Parts: Famous Brand Schneider
  • Capping: by Pressing
  • Transport Package: Wooden Block
  • Origin: Zhangjiagang
Product Description
Automatic 5 Gallon Bottle Pure Water Filling Machine
Functions :
QGF-1200R rotate 5 gallon water filling machinery is used for 5gallon bottle water
production , such as mineral water ,pure water , drinking water ,cleaned natural water for
drinking and so on , this water production line high automatically and very popular in the water plant from all over the world .
Main equipment items of the barrel water filling  production line :
The whole line is composed by the following
Automatic two heads de-capping machine
Automatic rotate barrel outside brushing machine
Automatic barrel loading system
Automatic barrel washing machine
Automatic rotate filling and capping machine 2-in-1
Automatic cap washing and loading system
Sleeve label machine with shrinking tunnel
Automatic barrel palletizer machine
Conveyor system
VIDEO LINK: https://www.youtube.com/watch?v=okwm5m1_rg8&list=PLkdGrU7IvF5NORm6yAyLX0duI574Q1Z57
Take note:the detail machines according to the user's requirements .
Filling technical description:
filling  technicas and structure is designed and innovated by ourselves. It adopts
large fluent filling and fix quantify filling . filling valve is SUS fine casting process,
it has air proof ring to avoid attrition of the metal .it is control by cylinder , and it is
stabilization . in the filling process, barrel after washing transport  to covey barrel screw.
The covey barrel screw apart the barrel equality to star-wheel. The star-wheel lead the
barrel to filling system.  When the filling cylinder meet journey switch,  cylinder moves
down to open filling valve.  Filling valve start to fill. After filling , cylinder meet with journey
switch again and move up. Filling valve close. The barrel after filling export by star-wheel.
And transport to capping machine by chains. Filling parts has 12 filling valves to satisfy the speed of the machine  at the same time , liquid position  is nicety because of controlling by journey switch.
Main configuration for the whole water  production line :
The whole line is controlled by SS electrical carbinate with touch screen ,PLC and transducer
brand is Japan Mitsubishi .water pump adopts the most famous brand in China named
NANFANG ,Motor reducer adopts the joint venture brand .penumatic system adopts AIRTAC.
 
Take note :the line configuration can be addigned by the customer's requirements .
Main parameters of the whole 5 gallon line :
ModelQGF-1200R
Rated output1200bph
Bottle size18.9L,5Gallon
Filling heads number12 rotate
Main machine power30kw
Air consumption0.8m³/min ,6-8bar

FAQ:
1.Delivery time : 35-45working days after recieved the bottle and cap samples
2.install machine need 7-15working days
3.we offer the drawing free according to the users workshop

GMN-671
Send your message to this supplier
Avatar
Miss Maria Wang
Sales Manager
*From:
To: Miss Maria Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now